Semi-Automatic Puzzle Parking System at 02 Pham Ngoc Thach Street, Hanoi

A semi-automatic parking system was deployed throughout all four basement levels, featuring a 2-level puzzle parking solution in each designated basement zone

1. Client Requirements


Located at 02 Pham Ngoc Thach Street, Dong Da District, Hanoi, the project is a mixed-use complex of offices, residences, and commercial services situated in the heart of the capital—a densely populated area with heavy daily traffic flow. With a total of four basement levels, the key challenge was how to optimize parking space to serve both residents and commercial customers, while also meeting technical standards and urban aesthetics.

The investor aimed to implement a smart, modern parking solution that would maximize space efficiency, ensure safety, and remain user-friendly within the basement levels of the building.
 

2. ETEK Parking’s Solution: Semi-Automatic Puzzle Parking System

puzzle parking

puzzle parking

puzzle parking

To meet the project's specific requirements, ETEK Parking proposed and implemented a 2-level semi-automatic puzzle parking system, integrated across all four basement levels. This solution was evaluated as the most suitable for efficiently utilizing underground space and maximizing the number of parking spots.

Project Details:

-  Location: 02 Pham Ngoc Thach Street, Dong Da District, Hanoi
-  Scope of Work: Design, supply, and installation of a semi-automatic parking system
-  Technology: 2-level Puzzle Parking System
Capacity: 193 mechanical parking spaces
Implementation Time: 120 days
Year of Implementation: 2025
Key Highlights:
+  The semi-automatic parking system was deployed across all four basement levels, with a 2-level puzzle parking system installed in each zone.
+  The solution was customized to fit the project’s existing infrastructure, making full use of basement height while ensuring technical safety.

3. Achieved Results

Upon completion and operation, the smart parking system implemented by ETEK Parking has delivered clear practical benefits to both the investor and end users:

Benefits for the Investor:
  • Doubled parking capacity without increasing construction area.
  • Optimized investment and operating costs compared to traditional parking solutions.
  • Enhanced commercial value and service quality for the office–residential–retail complex.

Benefits for Residents and Users:
  • Convenient and user-friendly, with fast and safe parking operations.
  • Saves time searching for parking, especially during peak hours.
  • Better vehicle protection, reducing the risk of collisions and damage in tight spaces.
Others Projects
Robocar Automatic Parking System in Hoan Kiem, Hanoi

The automatic parking system maximizes the use of space across 3 underground levels, increasing parking capacity compared to traditional lots.

The 3-Level Puzzle Automated Parking Project in Binh Duong
The semi-automatic 3-level puzzle parking system combined with a 2-level motorbike lift is an optimal parking model in terms of space utilization, operational efficiency, and cost-effectiveness.
Smart Puzzle Parking System in Binh Duong

ETEK Parking has implemented a 2-level smart puzzle parking system at the Phu Dong Sky Garden project, effectively solving the challenge of limited parking space.

Robocar Automated Parking System Project in Quang Ninh

ETEK Parking has successfully implemented an automated parking system using Robocar technology in Quang Ninh – one of the most advanced technologies currently available in the field of automated parking.

LARGEST AUTOMATIC PARKING SYSTEM IN VIETNAM
ETEK has completed the production and installation of the semi-automatic parking system project with 1,000 mechanical parking positions at the Symphony complex after nearly 7 months of construction.